Monday, January 30, 2023
The Property Reporter
  • Home
  • News
  • Retail
  • Residential
  • Office
  • Industrial
  • Hotel
  • Buying a Home
  • Selling a Home
No Result
View All Result
  • Home
  • News
  • Retail
  • Residential
  • Office
  • Industrial
  • Hotel
  • Buying a Home
  • Selling a Home
No Result
View All Result
The Property Reporter
No Result
View All Result
Home Office

Excavation Underway for 360 Bowery Office Tower in NoHo, Manhattan

PrR by PrR
2022-07-17
in Office
0
20
SHARES
152
VIEWS
Share on FacebookShare on Twitter


Excavation and foundation work are in full swing at 360 Bowery, the site of a 22-story commercial building in Noho, Manhattan. Designed by Morris Adjmi Architects and developed by AECOM-Canyon Partners under the ACEF-CBSKI 360 Bowery LLC, the 283-foot-tall structure will yield 112,617 square feet with 72,151 square feet of office space, 26,637 square feet of community facility space, and a cellar. SK Development of CBSK Ironstate are the owners and CM & Associates is the general contractor for the property, which is located at the corner of Bowery and East 4th Street. Ancora Engineering is the engineer of record for the excavation.

Demolition is complete on the former one-story occupant of the site and several excavators are working around numerous stacks of steel caissons that will soon be driven into the ground to form the new foundations. A temporary steel-framed assembly, designed by Ancora Engineering, is bracing the blank wall of the abutting building to the south. Work should steadily progress downward throughout the summer and into the fall months, and we can conceivably see the superstructure emerge sometime in the first half of 2023.

360 Bowery. Photo by Michael Young

360 Bowery. Photo by Michael Young

360 Bowery. Photo by Michael Young

360 Bowery. Photo by Michael Young

360 Bowery. Photo by Michael Young

360 Bowery. Photo by Michael Young

The rendering in the main photo shows the façade composed of floor-to-ceiling windows framed by a grid of metal columns and paneling, one of the architect’s signature design approaches. Several setbacks are positioned on the lower half of the tower, which culminates in a flat roof parapet and a mechanical bulkhead that blends with the envelope’s gray palette.

360 Bowery will offer tenants a choice of two interior design finishes: Alloy, with exposed polished concrete floors, porcelain subway tile backsplashes, straight-grain cheery laminate, matte black metal accents, and gray beige carpeted floors; and Timber, with 7-inch-wide engineered oak floors, Danube honed marble backsplashes, casual rustic black laminate, matte black metal accents, and gray beige carpeted floors. Floor plates range in size from 3,900 to 10,000 square feet with 12-foot ceiling heights. At the top is a 6,447-square foot duplex penthouse with a private terrace facing Bowery.

Amenities will include a boardroom, a 1,500-square-foot communal terrace, a fitness center, bicycle storage, and electric charging stations. The main lobby will be positioned along East 4th Street, with a separate private lobby on the southern corner along Bowery. The nearest subways from 360 Bowery are the local 6 train at the Bleecker Street station and B, D, F, and M trains at the Broadway-Lafayette Street station.

An estimated completion date of 2024 is posted on the construction board.

Subscribe to YIMBY’s daily e-mail

Follow YIMBYgram for real-time photo updates
Like YIMBY on Facebook
Follow YIMBY’s Twitter for the latest in YIMBYnews

358 Bowery Architecture CBSK Ironstate Construction Update Morris Adjimi Architects Morris Adjmi Morris Adjmi Architects New York SK Development





Source link

Previous Post

Bears euthanized after frequenting residential properties, accessing unsecured attractants – Char-Koosta News

Next Post

Conservative leadership race: Raab attacks Truss record at treasury – UK politics live | Politics

Next Post

Conservative leadership race: Raab attacks Truss record at treasury – UK politics live | Politics

RECOMMENDED

MGM Resorts International (MGM) Q2 2022 Earnings Call Transcript

2022-08-04

Cedar Fair (FUN) Q2 2022 Earnings Call Transcript

2022-08-03

MOST VIEWED

  • Fox Lake hopes to bring hotel to Mineola lakefront site; ‘Recognizing our unique position on the Chain O’ Lakes is a key driver for our progress’ – Chicago Tribune

    753 shares
    Share 301 Tweet 188
  • Doubling Down With the Derricos’ Deon boasts about ‘buying up blocks’ & promotes real estate business after foreclosure

    193 shares
    Share 77 Tweet 48
  • Historic home on 32-acre site annexed into Elgin for new industrial development free to anyone who wants to move it

    156 shares
    Share 62 Tweet 39
  • Plas Glynllifon’s new owner speaks for first time on difficult challenge to renovate mansion

    119 shares
    Share 48 Tweet 30
  • Atlanta developer plans downtown Dallas towers

    94 shares
    Share 38 Tweet 24

Recent Posts

  • MGM Resorts International (MGM) Q2 2022 Earnings Call Transcript
  • Cedar Fair (FUN) Q2 2022 Earnings Call Transcript
  • NYC’s First Half CRE Investment Sales Volume up 99 percent: Report – Commercial Observer
  • Designers share tips for bringing more color into your home
  • Colleges get creative to solve student housing squeeze

CATEGORY

  • Buying a Home
  • Hotel
  • Industrial
  • News
  • Office
  • Residential
  • Retail
  • Selling a Home
  • Privacy & Policy
  • About Us
  • Contact Us
  • Advertise with us

© 2021 Copyright Property Reporter

No Result
View All Result
  • Home
  • News
  • Retail
  • Residential
  • Office
  • Industrial
  • Hotel
  • Buying a Home
  • Selling a Home

© 2021 Copyright Property Reporter